To
establish an effective cooling solution for any new or upgraded data
center or computer room, it is essential to establish a set of
design goals. Experience suggests these goals can be categorized as
follows:
Adaptability
- Plan for increasing critical load power densities
- Utilize standard, modular cooling system components to speed changes
- Allow for increasing cooling capacity without load impact
- Provide for cooling distribution improvements without load impact
Availability
- Minimize the possibility for human error by using modular components
- Provide as much cooling system redundancy as budget will allow
- Eliminate air mixing by providing supply (cold air) and return (hot air) separation to maximize cooling efficiency
- Eliminate bypass air flow to maximize effective cooling capacity
- Minimize the possibility of fluid leaks within the computer room area as well as deploy a detection system
- Minimize vertical temperature gradients at the inlet of critical equipment
- Control humidity to avoid static electricity build up and mold growth
Maintainability
- Deploy the simplest effective solution to minimize the technical expertise needed to assess, operate, and service the system
- Utilize standard, modular cooling system components to improve serviceability
- Assure system can be serviced under a single service contract
Manageability
- Provide accurate and concise cooling performance data in the format of the overall management platform
- Provide local and remote system monitoring access capabilities
Cost
- Optimize capital investment by matching the cooling requirements with the installed redundant capacity and plan for scalability
- Simplify the ease of deployment to reduce unrecoverable labor costs
- Utilize standard, modular, cooling system components to lower service contract costs
- Provide redundant cooling capacity and air distribution in the smallest feasible footprint
Back to the Top
Once your design goals are established there are a
number of additional steps recommended for data center cooling best
practices.
-
Determine the Critical Load
and Heat Load.
Determining the critical heat load starts with the identification of
the equipment to be deployed within the space. However, this is only
part of the entire heat load of the environment. Additionally, the
lighting, people, and heat conducted from the surrounding spaces
will also contribute to the overall heat load. As a very general
rule-of-thumb, consider no less than 1-ton (12,000 BTU/Hr / 3,516
watts) per 400 square-feet of IT equipment floor space.
-
Establish Power Requirements
on a per RLU Basis.
Power density is best defined in terms of rack or cabinet foot print
area since all manufacturers produce cabinets of generally the same
size. A definite Rack Location Unit (RLU) trend is that average RLU
power densities are increasing every year. The reality is that a
computer room usually deploys a mix of varying RLU power densities
throughout its overall area. The trick is to provide predictable
cooling for these varying RLU densities by using the average RLU
density as a basis of the design while at the same time providing
adequate room cooling for the peak RLU and non-RLU loads.
-
Determine the CFM Requirements for each RLU.
Effective cooling is accomplished by providing both
the proper temperature and an adequate quantity of air to the load.
As temperature goes, the American Society of Heating, Refrigerating,
and Air-Conditioning Engineers (ASHRAE) standard is to deliver air
between the temperatures of 68 °F and 75 °F to the inlet of the IT
infrastructure. Although electronics performs better at colder
temperatures it is not wise to deliver lower air temperatures due to
the threat of reaching the condensate point on equipment surfaces.
Regarding air volume, a load component requires 160 cubic feet per
minute (CFM) per 1 kW of electrical load. Therefore, a 5,000-watt 1U
server cabinet requires 800 CFM.
-
Perform Computational Fluid Dynamic (CFD) Modeling.
CFD modeling can
be performed for the under floor air area as well as the area above
the floor. CFD modeling the airflow in a computer room provides
information to make informed decisions about where to place CRAC
equipment, IT-equipment, perforated tiles, high density RLUs, etc.
Much of the software available today also allows mapping of both
under floor and overhead airflow obstructions to more accurately
represent the environment.
-
Determine the Room Power Distribution
Strategy. The two (2) main
decisions in developing a room power distribution strategy are: (1)
Where to place the power distribution units (PDUs)?, (2) Whether to
run power cables overhead or under the floor?
-
Determine the Cabinet Power
Distribution Strategy. In deciding how power will be
distributed through the cabinet, use of dual power supplies, and
cabling approach, it is important to understand the impact of power
distribution on cooling, particularly as it is related to air flow
within the cabinet.
-
Determine the Room & Cabinet Data Cabling Distribution Impact.
Typically, there are three (3) choices in delivering network
connectivity to an RLU. They are: (1) Home run every data port from
a network core switch, (2) Provide matching port-density patch
panels at both the RLU and the core switch with pre-cabled
cross-connections between them, such that server connections can be
made with only patch cables at both ends, (3) Provide an edge switch
at every rack, row, or pod depending on bandwidth requirements. This
approach is referred to as zone switching.
-
Establish a Cooling Zone
Strategy. Recall that effective computer room cooling is as much about
removing heat as it is about adding cold. Generally speaking, the
three (3) equipment cooling methods along with their typical cooling
potential can be determined from the following table:
|
Room Cooling
|
~2 kW per RLU
|
|
Row Cooling
|
~8 kW per RLU
|
|
Cabinet Cooling
|
~20 kW per RLU
|
It is also critical to consider high-density cooling and zone cooling requirements.
-
Determine the Cooling
Methodology. Upon determining what cooling zone will be required, the decision of
what types of air conditioners will be needed, must be made. There
are four (4) air conditioner types: (1) air cooled, (2) glycol
cooled, (3) condenser water cooled, (4) chilled water.
In addition, it is also
important to determine how heat will be rejected within the system
and what type of cooling redundancy is required and available for a
particular methodology.
-
Determine the Cooling Delivery Methodology.
Different architectural attributes affect cooling performance in
different ways. For instance, designs should consider the location
of the computer room within the facility (I.e. onside versus inside
rooms), height of the raised floor, height of suspended ceiling,
etc.
-
Determine the Floor Plan.
The ‘hot aisle / cold aisle’ approach is the accepted layout
standard for RLUs for good reason. It works. It was developed by,
Dr. Robert Sullivan, while working for IBM and it should be adapted
for both new and retrofit projects. After determining the hot/cold aisles it is critical to place
the CRAC units for peak performance. This may include room, row, or
rack based cooling approaches. Each works well depending upon the IT
infrastructure, power densities, CFM requirements, and other
attributes previously discussed.
-
Establish Cooling Performance
Monitoring. It is vital to develop and
deploy an environmental monitoring system capable of monitoring each
room, row, and cabinet cooling zone. A given is that once effective
cooling performance is established for a particular load profile, it
will change rapidly. It is important to compile trending data for
all environmental parameters for the site such that moves, adds, and
changes can be executed quickly.
To
learn more about PTS recommended Air Conditioning Equipment &
Systems,
contact us or visit:
To learn more
about PTS consulting services to support Air Conditioning Equipment
& Systems deployments and support,
contact us or visit:
Back to the Top
|